ГЛАВНАЯ>О ФИРМЕ>Новости>
Новости CCTV Reports Weihua Crane for Lhasa-Shigatse Railway

Опубликовано:2016-04-30 08:21

Смотреть:

Источник:卫华集团

CCTV Reports Weihua Crane for Lhasa-Shigatse Railway
2014-08-15
On August 15, 2014, Lhasa-Shigatse Railway connecting the capital and the second largest city in Tibet province was officially opened and began its operation. This rail way has been constructed since 2010, and invested more than 2.2 billion USD, the cost of every meter is more than 8000USD. The Lhasa-Shigatse Railway is of highest elevation in China.

As leading crane manufacturer in China, Weihua has provided many reliable crane equipments for large scale domestic railway project. Large span crane special for Lhasa-Shigatse Railway requires very high reliability, because the project is carrying out with elevation of above 3700m and ambient temperature of 40~90 Celsius degree.To solve these difficulties, Weihua set up key project team, this team conscientiously made technology plan, fabricated and delivered the crane on time. This crane performed well during work time, its function completely met customer’s request, which contributed a lot to Lhasa-Shigatse’ on time completion.

The CCTV-1 reported related news on August 16, 2014.


 
PRE:Large Tropsch Synthesis Reactor Hoisting Completion NEXT:The Defense Minister Says Good To Weihua Crane
Рекомендуем